An under-sink reverse osmosis unit is a small system with a lot of connections packed into a tight cabinet. The sequence matters, because each step depends on the one before it. This guide walks through the stages in the order a careful installer usually works, along with the checks you can make at each one. Your installer's method may differ in detail, and the unit's manual governs its specific steps.

Before the crew arrives

Clear the cabinet under the sink completely. Remove cleaners, bags, and anything that could be crushed or damaged. Confirm where the faucet will go, whether it uses an existing hole or needs a new one, and ask who drills it. Confirm the drain connection point too, because the unit's drain tube has to reach it without a long, sagging run across the cabinet floor.

Ask the installer to show you the cold supply shutoff under the sink and turn it by hand. It should move freely and close fully. If it does not, say so before anyone starts work. That valve is the one you will rely on if something goes wrong later.

Shutoff, feed connection, and mounting

The installer should close the cold feed and open a faucet to relieve pressure before cutting or adding any fitting. Ask how they plan to tap the feed line and whether the kit's connection method matches the fittings already in your home. Mismatched fittings are a common source of drips later.

Next, mount the storage tank and the filter housings where the manual calls for, with enough room to change cartridges without moving the whole unit. Check that the supply line and drain tube do not rest on sharp edges or get pinched against the cabinet back.

Faucet and drain

Install the dedicated faucet, then connect the drain. Make sure the drain fitting follows the manual, including any air gap it requires. Do not accept a drain connection that feeds directly into a trap without that step. Ask the installer to show you where the drain water goes when the unit runs, so you know what a normal discharge looks like.

Flushing and first fill

Most units need the storage tank to fill and the membrane to be flushed before you draw drinking water. The manual states how long that takes, and the installer should carry the unit through that step rather than leaving it for you to finish alone. Open the feed valve slowly, then check every joint for drips once pressure returns. Expect some air and sputtering at first. Let the tank fill fully, and confirm the faucet runs without leaking at its base.

What to check before the crew leaves

Look under the sink again after the first hour of normal use. The cabinet floor should be dry. Confirm the faucet operates smoothly, the tank holds water, and the drain runs freely. Ask the installer to point out the cartridge shutoffs and show you how to close the unit's own valve if you need to. Record the model number and cartridge types on paper and tape it inside the cabinet, so the next person who opens it knows what to order.